Environmental Protection Project For Medupi Thermal Power Plant

Country
South Africa South Africa
Status
Cancelled
Area Of Operation
Environmental Protection Environmental Protection
Type
Sovereign

Quick Facts

Financing Approval Date
31 March 2019
Current Limit of NDB Financing
USD 480 million
Borrower
Eskom Holdings SOC, Ltd
Project Entity
Eskom Holdings SOC, Ltd

More About This Project

South Africa’s indigenous energy resource base is dominated by coal, which is used in generation of around 90% of the electricity produced in South Africa. In 2005, the Government of South Africa passed the National Environmental Management Air Quality Act (NEMAQA), which defines the pollutant emissions limits for power plants. The Project is designed to support South Africa’s commitment to reducing environmental pollution in the energy sector.

The contents of the Project include the design and construction of six flue gas desulphurization units along with ancillary facilities on the existing Medupi thermal power plant to reduce its sulphur dioxide emission.

The objective of the Project is to achieve sulphur dioxide (SO2) emission reduction of Medupi coal-fired power plant from 3,500 mg/m3 to below 500mg/m3 from 2026 onwards.

The Project is planned to be implemented over 7 years. Eskom will be the Project Implementation Agency.

The positive impacts of the Project include reduction of SO2 concentration in Waterberg municipal district of Limpopo Province, contributing to: i) decreased adverse health impacts, particularly for respiratory health of the residents of the area; ii) reduced negative environmental impact caused by acid deposition. The Project has been classified as Category “A”, in accordance with NDB Environment and Social Framework (ESF). The negative environmental and social impacts can be mitigated by adherence to established environmental and social practices and requirements of the country system, as well as additional social management plans that have been developed for the Project. The negative impacts mainly pertain to i) risks related to labor strikes; ii) social tensions with communities related to expectations of employment; iii) compromised road safety resulting in high road accident rate.

The total cost of the Project is estimated to be USD 2,750 million. The NDB will finance USD 476 million, accounting for 17% of the total cost. The remaining balance will be financed by other co-financiers.

Source of Fund Amount (USD million)
NDB 476
Cofinanciers and Eskom 2,274
NDB Borrower and Project Entity
Public Sector Department

Yang Luo

Eskom Holdings SOC, Ltd

Priscilla Jezi