Skip to content

Program for Upgrade of Infrastructure for Metropolitan Municipal Services

Country
South Africa South Africa
Status
Approved
Area Of Operation
Multiple Areas Multiple Areas
Type
Sovereign

Quick Facts

Financing Approval Date
June 09, 2026
Current Limit of NDB Financing
USD 1 billion
Borrower
The Republic of South Africa
Project Implementing Entity
National Treasury of South Africa

More About This Project

South Africa’s eight metropolitan municipalities (Metros) – Buffalo City, City of Cape Town, City of Ekurhuleni, City of Johannesburg, City of Tshwane, eThekwini, Mangaung and Nelson Mandela Bay, play a critical role in driving the country’s socio-economic development. However, these urban centers face mounting challenges posed by high levels of non-revenue water, ageing electricity networks prone to outages and non-compliant waste treatment sites. The Program seeks to reverse the declining trend in the delivery of essential urban services of water supply and sanitation, electricity distribution, and solid waste management (collectively also referred to as “trading services”) across the Metros.

The Program will support the Metro Trading Services Grant of the Government of South Africa, a performance-based incentive aimed at addressing critical infrastructure gaps and institutional shortcomings in provision of trading services in the Metros. The Program comprises three components. Component 1 focuses on improving operational performance through targeted investments in physical infrastructure and digital systems across the three trading services. Component 2 aims to enhance the financial performance of trading services, while Component 3 supports institutional strengthening including capacity building.

The Program aims to enhance infrastructure performance, financial sustainability and institutional governance across the three trading services in the eight Metros. The Program is expected to directly and indirectly benefit the 24 million residents of the Metros through improved service delivery, contributing to better living conditions and a stronger urban investment climate in line with the South Africa’s National Development Plan 2030.

The National Treasury will be responsible for the overall Program management. The eight metropolitan municipalities will ensure implementation of activities to achieve the objectives of the Program. The implementation period for the Program is six years from FY2026 to FY2031.

The Program has been categorized as Category B in accordance with the NDB Environment and Social Framework (NDB ESF). The Program presents moderate environmental and social (E&S) impacts arising from low- to medium-risk activities pertaining to public infrastructure upgrades at existing water and sanitation, electricity, and solid waste facilities can be readily identified, assessed, and effectively mitigated. E&S impacts and risks will be mitigated by adhering to country system requirements and implementing actions as outlined in the Environmental and Social Impact Management Plan developed for the Program.

Source of Funds Amount 
NDB Loan USD 1 billion
Other budgetary sources, including loans from other international financing institutions supporting the Program USD 2.1 billion
NDB Borrower Project Entity
Public Sector Department

Jitesh Ketkar

The Republic of South Africa

Ogalaletseng Gaarekwe

ogalaletseng.gaarekwe@treasury.gov.za

National Treasury

Ogalaletseng Gaarekwe

ogalaletseng.gaarekwe@treasury.gov.za